Two 48-hour Hwy. 126 closures coming

MCKENZIE BRIDGE: Work continues on Hwy. 126 from the Linn County line to the Old McKenzie Highway – along a section known as the Clear Lake Cutoff. There will also be 48-hour closures from August 20th to the 22nd., in addition to the current schedule of half-day closures from August 1st through 8th, – Sunday through Thursday nights – from 8 p.m. to 6 a.m. (with Fridays and Saturdays excluded). Besides repaving the roadway, three bridges in the section are also being resurfaced as part of the $7.3 million project.
